Fort Collins Project

Fort Collins, CO

  • Project #: 4-2025 | Commercial

  • Assignment: Maximize the redirection of material away from the landfill and minimize the incremental cost of deconstruction relative to “standard demolition”

  • Description: Complete demolition of one church and one office building

  • Duration: 8 months

  • Project Contact: Bob Tobiason

    • 408-605-7179

    • bobt@circbuild.com

  • Comments: N/A


Project Metrics:

Materials categories diverted:

  • Metals

  • Millwork exterior

  • Millwork interior

  • Electrical

  • Furnishings

  • Specialties

  • Doors

  • Windows

  • Concrete

Analytics:

Objects Obtained: 253 objects (desks, chalk boards, lights, etc) diverted from Landfill and donated to local nonprofits

Volume of materials diverted from the landfill: 460 cubic yards

Reduced area in landfill: approx. 35’ x 35 x 10’

Recycled objects: 1.2 millions pounds of concrete recycled, 46,000 pounds of metals recycled

Energy saved: 42,025 kgCO2e diverted from the landfill, this is the equivalent of 105,000 miles driven in a gasoline car, 71 flights from Denver to New York, or 210 tree seedlings absorbing carbon for 20 years.

Jobs created: 556 labor hours