Fort Collins Project
Fort Collins, CO
Project #: 4-2025 | Commercial
Assignment: Maximize the redirection of material away from the landfill while minimizing the incremental cost relative to “standard demolition”
Description: Complete demolition of one church and one office building
Duration: 8 months
Project Contact: Bob Tobiason
408-605-7179
bobt@circbuild.com
Comments: N/A
Project Metrics:
Materials categories diverted:
Metals
Millwork exterior
Millwork interior
Electrical
Furnishings
Specialties
Doors
Windows
Concrete
Quantities of materials diverted:
Metal railing: 30 sf
Wood siding: 50 sf
Exterior lights: 2 each
Prefabricated metal fireplace: 1 each
Doors-exterior: 2 each
Windows: 4 each
Interior wood trim: 50 sf
Decking-composite: 120 sf
Outdoor table: 1 each
Analytics:
(INSERT INFOGRAPHICS HERE)
Volume of materials diverted: 8.25 cubic yards
Weight of materials diverted: 2,500 lbs
Embodied carbon averted through reuse: 15,621 kg
Jobs created: 13.5 labor hours
Interesting fact: The amount of carbon averted by reusing these materials is equivalent to the CO2 emissions from consuming 42,566 kw-hours of electricity. This amount of energy corresponds with the annual electricity usage of approximately 4 US households.