Fort Collins Project

Fort Collins, CO

  • Project #: 4-2025 | Commercial

  • Assignment: Maximize the redirection of material away from the landfill while minimizing the incremental cost relative to “standard demolition”

  • Description: Complete demolition of one church and one office building

  • Duration: 8 months

  • Project Contact: Bob Tobiason

    • 408-605-7179

    • bobt@circbuild.com

  • Comments: N/A


Project Metrics:

Materials categories diverted:

  • Metals

  • Millwork exterior

  • Millwork interior

  • Electrical

  • Furnishings

  • Specialties

  • Doors

  • Windows

  • Concrete

Quantities of materials diverted:

  • Metal railing: 30 sf

  • Wood siding: 50 sf

  • Exterior lights: 2 each

  • Prefabricated metal fireplace: 1 each

  • Doors-exterior: 2 each

  • Windows: 4 each

  • Interior wood trim: 50 sf

  • Decking-composite: 120 sf

  • Outdoor table: 1 each

Analytics:

(INSERT INFOGRAPHICS HERE)

Volume of materials diverted: 8.25 cubic yards

Weight of materials diverted: 2,500 lbs

Embodied carbon averted through reuse: 15,621 kg

Jobs created: 13.5 labor hours

Interesting fact: The amount of carbon averted by reusing these materials is equivalent to the CO2 emissions from consuming 42,566 kw-hours of electricity. This amount of energy corresponds with the annual electricity usage of approximately 4 US households.